Expert Experience
Our EXPERT Experience
Years of hands-on expertise in every project
- Phase II ESA Baseline conducted over a 470,000 square meter area for CATL’s future plant in Karawang, West Java, Indonesia. (2024)
- Environmental function recovery/remediation plan developed for a former manufacturing facility in East Jakarta, for a confidential client. (2024)
- Soil Investigation carried out on a land parcel within the KIIC Industrial Estate, Karawang, West Java, Indonesia. (2024)
- Pumping Test Study conducted on three deep abstraction wells at Abbott Indonesia, located in Cimanggis, West Java, Indonesia. (2024)
- Soil investigation/delineation performed at a former manufacturing facility in East Jakarta, for a confidential client. (2023)
- Environmental Energy Due Diligence conducted at the Krakatau Steel facility in Cilegon, Banten, overseen by TUV SUD. (2023)
- Environmental Social Due Diligence completed for Lightstorm in Greater Jakarta, Central Java, and East Java, Indonesia, overseen by TUV SUD
- Phase I ESA conducted at Nufarm in Cilegon, Banten, Indonesia. (2024)
- Phase II ESA performed on a land parcel for Baker Hughes in Balikpapan, East Kalimantan, Indonesia. (2023)
- Recovery well test executed at PT Fermentech Indonesia, located in Lampung, Indonesia. (2024)
- EHS Compliance Audit conducted at Collins Aerospace, situated in Bandung, West Java, Indonesia. (2023)
- Baseline Phase II ESA carried out on a land parcel within MM2100 Industrial Estate, Bekasi, West Java, Indonesia. (2023)
- Baseline Phase II ESA conducted on a land parcel within GIIC Industrial Estate, Bekasi, West Java, Indonesia. (2023)
- Soil and groundwater investigation undertaken at a former automotive manufacturing facility in Jakarta, Indonesia. (2023)
- Bukaka Teknik Utama conducted site remediation at Santan and Lawe-Lawe terminals for PT Chevron Indonesia Company in 2018.
- Maharani Prima executed groundwater deep well installation, reverse osmosis system, hydrogeology study, and resistivity tests for Indonesia Power.
- Envi Reksatama Engineering conducted ASTM Phase II Environmental Site Assessment for Exxon Mobil Cepu Limited’s Banyu Urip Project.
- Consortium of PT Radiant Utama Internesco Tbk and PT Envi Reksatama Engineering performed ASTM Phase I Environmental Site Assessment for PT Chevron Pacific Indonesia’s Rokan Block Environmental Site Assessment for hydrocarbon spills.
- PT Envireksatama Engineering conducted Environmental Site Assessment Phase II at ex-Well pad A.
- Various consultancy firms from outside Indonesia also participated in similar projects.