Expert Experience

Our EXPERT Experience

Years of hands-on expertise in every project

  • Phase II ESA Baseline conducted over a 470,000 square meter area for CATL’s future plant in Karawang, West Java, Indonesia. (2024)
  • Environmental function recovery/remediation plan developed for a former manufacturing facility in East Jakarta, for a confidential client. (2024)
  • Soil Investigation carried out on a land parcel within the KIIC Industrial Estate, Karawang, West Java, Indonesia. (2024)
  • Pumping Test Study conducted on three deep abstraction wells at Abbott Indonesia, located in Cimanggis, West Java, Indonesia. (2024)
  • Soil investigation/delineation performed at a former manufacturing facility in East Jakarta, for a confidential client. (2023)
  • Environmental Energy Due Diligence conducted at the Krakatau Steel facility in Cilegon, Banten, overseen by TUV SUD. (2023)
  • Environmental Social Due Diligence completed for Lightstorm in Greater Jakarta, Central Java, and East Java, Indonesia, overseen by TUV SUD
  • Phase I ESA conducted at Nufarm in Cilegon, Banten, Indonesia. (2024)
  • Phase II ESA performed on a land parcel for Baker Hughes in Balikpapan, East Kalimantan, Indonesia. (2023)
  • Recovery well test executed at PT Fermentech Indonesia, located in Lampung, Indonesia. (2024)
  • EHS Compliance Audit conducted at Collins Aerospace, situated in Bandung, West Java, Indonesia. (2023)
  • Baseline Phase II ESA carried out on a land parcel within MM2100 Industrial Estate, Bekasi, West Java, Indonesia. (2023)
  • Baseline Phase II ESA conducted on a land parcel within GIIC Industrial Estate, Bekasi, West Java, Indonesia. (2023)
  • Soil and groundwater investigation undertaken at a former automotive manufacturing facility in Jakarta, Indonesia. (2023)
  • Bukaka Teknik Utama conducted site remediation at Santan and Lawe-Lawe terminals for PT Chevron Indonesia Company in 2018.
  • Maharani Prima executed groundwater deep well installation, reverse osmosis system, hydrogeology study, and resistivity tests for Indonesia Power.
  • Envi Reksatama Engineering conducted ASTM Phase II Environmental Site Assessment for Exxon Mobil Cepu Limited’s Banyu Urip Project.
  • Consortium of PT Radiant Utama Internesco Tbk and PT Envi Reksatama Engineering performed ASTM Phase I Environmental Site Assessment for PT Chevron Pacific Indonesia’s Rokan Block Environmental Site Assessment for hydrocarbon spills.
  • PT Envireksatama Engineering conducted Environmental Site Assessment Phase II at ex-Well pad A.
  • Various consultancy firms from outside Indonesia also participated in similar projects.
OUR EXPERIENCE
Enviromental Site Assessment
OUR EXPERIENCE
Enviromental and Social Performance Standards Required
OUR EXPERIENCE
Geo Service